Pictorial of a Cabling Project
Pictorial of a cabling infrastructure project from start to finish.
-
Week 1 Unpopulated APC data cabinets. Raised Raised floor openings are properly positioned for "Hot Aisle / Cold Aisle" configuration.
-
Week 1 Tony Diaz and Mike Hoernecke review the cable plan before pulling into the distribution racks commences.
-
Week 1 Tony, Dean Sommo, and Mike discuss the project near the APC data cabinets. -
Week 2 Boxes of color-coded Cat 6 cable are arranged and ready for the pulls. -
Week 2 A technician pulls out a stretch of cables in preparation for a station run. -
Week 2 A technician terminates cables onto Siemon Z-MAX modular patch panels. All cables are neatly secured with velcro wraps. -
Week 2 A view from above. Cables are supported by ladder rack system as they enter into the cabinets and racks. -
Week 2 Tony steps inside the line of cabinets to prepare the armored fiber optic cables for terminations. -
Week 3 A wave of Cat 6 cables cascade from a ladder rack, waiting to be pulled back an terminated into the modular patch panels. -
Week 3 Some switching equipment is installed and functioning. The modular patch panel above is fully terminated, with velcro wraps securing the cables. -
Week 3 Front view of a rack filled with Siemon Z-MAX modular patch panels, labeled and ready for patching. -
Week 3 A close-up of velcro-wrapped cables entering the vertical wire management system. -
Week 4 Color-coded Cat 6 cables exiting inter-floor conduits and neatly secured onto the ladder rack system. -
Week 4 Cables take a gentle turn through an inside radius section of ladder rack. -
Week 4 Cables are coiled aside, awaiting installation of furniture cubicles. -
Week 6 Toward the project completion date, all cables and terminations are tested and certified -
Week 6 Siemon Z-Max patch panel from the front, neatly patched and labeled. -
Week 6 Switching equipment, neatly patched with Cat 6E (bottom) and fiber optic (top). -
Week 6 Putting the finishing touches on a patch panel. -
Week 6 A line of fully populated APC data cabinets. -
Week 6 Completed ladder rack system.
Pictorial of a cabling infrastructure project from start to finish.